Water Supply·2021·OngoingKoppal — Filling of TanksFilling of tanks in Yelburga and Koppal taluks by lifting water from the Tungabhadra river for drinking purposes.Yelburga & Koppal Taluks, Koppal District, Karnataka
Water Supply·2022·OngoingMagadi — Filling of Tanks for Drinking WaterDrinking water to 83 tanks under the Hemavathy Project.Magadi Taluk, Ramanagara District & Kunigal Taluk, Tumkur District, Karnataka
Water Supply·2023·CompletedTK Halli — 3000mm MS Raw Water Transmission MainSupplying, fabrication and laying of 3000mm dia MS pipeline from SBR to NBR for a length of 6.15 km.Karnataka
Irrigation·2025·OngoingMehakar & Aurad LIS STAGE-ISurvey, Investigation, Design, Supply, Installation, Testing and Commissioning of Mehakar & Aurad Lift Irrigation Scheme Stage - I.Bhalki, Karnataka
Sewerage·2025·OngoingBommanahalli - Construction of STPs & ISPsConstruction of 02 No's STPs & 02 No's ISPs in Bommanahalli Zone Bommanahalli, Bangalore
Water Supply·2026·OngoingChennai - Ring Main (GCC Limit)Providing a Ring Main System in Chennai City (GCC limit) including Operation and Maintenance for 10 yearsChennai